Adding Living Space Without Leaving Your Property

Accessory Dwelling Unit Construction in Fremont, California

If you own property in Fremont and need additional living space for aging parents, adult children, or rental income, an accessory dwelling unit allows you to add a separate residence on your lot without purchasing a second property. ADUs in Fremont are subject to local zoning and setback requirements, but recent California legislation has simplified permitting and increased allowable unit sizes for many residential parcels.

HR RENOVATION LLC provides ADU construction services that include foundations, utilities, framing, finishes, and inspections, with familiarity in Bay Area zoning, permitting, and space constraints. The company is a licensed and insured contractor with over 15 years of experience building ADUs across Fremont, San Jose, Palo Alto, and surrounding cities. Units are designed for efficiency, comfort, and long-term value.

Request a free ADU feasibility estimate to review zoning, site conditions, and layout options for your Fremont property.

Get a Quote

Get a Quote

All fields marked with an asterisk * are required

What Goes Into Building a Detached ADU

Your ADU construction in Fremont begins with a site survey to determine setback distances, utility connection points, and grading requirements, followed by permit applications submitted to the city. Foundations are poured after approval, and framing, roofing, and exterior sheathing are completed before rough-in work for electrical, plumbing, and HVAC systems begins.

After completion, you will notice a fully functional living space with its own kitchen, bathroom, heating and cooling, and dedicated electrical panel. The unit is insulated to California energy standards, and windows are positioned to provide natural light while maintaining privacy from the main house.

The scope includes installation of flooring, cabinetry, countertops, appliances, lighting, and trim, along with final inspections required for certificate of occupancy. Utility connections to the main house are upgraded if existing capacity is insufficient. The service does not include landscaping, fencing, or exterior hardscaping unless specified during the estimate phase. Construction timelines depend on permit approval, site access, and weather conditions.

Concerns About ADU Projects Are Normal

Homeowners considering ADU construction often want to know how long permitting takes, what utilities need to be upgraded, and whether the unit can be used for rental income.

How long does it take to get ADU permits in Fremont?
Permit timelines vary, but most ADU applications in Fremont are approved within 60 to 90 days. Delays can occur if the site requires zoning variances or additional engineering review.
What utilities need to be connected to the ADU?
The ADU requires connections for electrical, water, sewer or septic, and gas if appliances use it. Utility lines are run from the main house or street, and upgrades to the main panel or water meter may be needed.
Why are ADUs popular in Fremont and nearby cities?
High housing costs and limited lot availability make ADUs an attractive option for adding living space or generating rental income without relocating. Recent California laws have made permitting more accessible.
What size ADU can be built on my property?
Allowable ADU size depends on lot size, zoning, and setback requirements. Most Fremont properties can accommodate units between 600 and 1,200 square feet, but site-specific factors affect final dimensions.
What happens after the ADU is completed?
Final inspections are scheduled with the city, and a certificate of occupancy is issued once all work is approved. You can then use the unit for family housing, rental income, or other permitted purposes.

HR RENOVATION LLC manages ADU construction across Fremont, San Jose, Palo Alto, and surrounding cities with attention to zoning, permitting, and build quality. Get in touch to discuss your ADU project and site feasibility.